Transformer Power Analysis and Testing
The testing of power transformers makes a couple of different measurements necessary, which are described in the international IEC 60076 standard.
Our data acquisition systems provide key features for complete power transformer testing:
Scope and Vector Scope offer the capability to analyze the voltage ratio and phase displacement of different primary and secondary configurations (star, delta, interconnected star).
Transient recording functionality allows storing all signals at the full sampling rate for detailed analysis. In combination with the trigger functionality failures and transient events (also during long-term measurements of the transformer) can easily be detected.
Analysis according to IEC 60076 standard
Correction of power losses depending on temperature
Additional software sensor calibration
Measure harmonics and symmetrical components